banner proyectos 01

Chimneys Dismantling at El Grao, Castellón

The chimneys of the Iberdrola thermal power plant at El Grao Castellón, are currently being dismantled.

Those works are taking place with the help of ALHER equipment, particularly by using several PM 200 Mast Climbing Work Platforms and an elevator for passengers and materials T5-CR model, specially configurated to 150 m high.

REMARQUE ! Ce site utilise des cookies et autres technologies similaires.

Si vous ne changez pas les paramètres de votre navigateur, vous êtes d'accord. En savoir plus

J'ai compris

CONTACT

ELEVADORES ALHER, S.A.
Uzbina 22, Pol. Ind. Júndiz
01015 VITORIA – GASTEIZ (ÁLAVA)
España

 

T. +34 945 278 055
F. +34 945 26 93 75
alher@alher.es

Log in or Sign up